Fox High School

Project Overview

Jarrell was selected as the prime contractor to upgrade the HVAC systems at Fox High School’s second wing. The project involved removing outdated residential split systems and replacing them with a modern Variable Refrigerant Flow (VRF) system paired with Dedicated Outside Air Systems (DOAS) for classroom ventilation and comfort.

  • Location: Arnold, MO.
  • Market Sector: Education
  • Timeline: May 2025 - August 2025
  • Owner - Fox School District

USPS, AL

 

Fox High School

Project Scope

Despite a late spring approval, our team successfully planned and executed the installation during the short summer break window. With a compressed timeline, our VRF expertise and efficient scheduling ensured that the new systems were fully installed, tested, and ready for the start of the school year.