Fox High School
Project Overview
Jarrell was selected as the prime contractor to upgrade the HVAC systems at Fox High School’s second wing. The project involved removing outdated residential split systems and replacing them with a modern Variable Refrigerant Flow (VRF) system paired with Dedicated Outside Air Systems (DOAS) for classroom ventilation and comfort.
- Location: Arnold, MO.
- Market Sector: Education
- Timeline: May 2025 - August 2025
- Owner - Fox School District