24-Hour Emergency Service314-291-0100

Clarkson Executive BuildingA Jarrell Case Study

In June of 2017 the Clarkson Executive Building lost a 170 ton water cooled DX unit. Our team sprang into action setting up a temporary system and having the building cooling within 24 hours. We then replaced the DX unit and coils with a new 200 Ton Trane Chiller, new water coils and new 400 ton cooling tower. The new system featured a new Distech Control System that  operates the drives and fresh air louvers. The four blower assemblies were also upgraded from pneumatic controls and inlet guide wanes to new ABB drives. This project was commission by the property manager, Intelica.

When completed, we had secured the customer $31,000.00 in Ameren incentives back for the upgrades done to the building.