24-Hour Emergency Service314-291-0100

CityPlace One

Project Overview

This project included the installation of a modern digital Building Automation System (BAS) in order to efficiently control the building’s HVAC systems. The components that were installed during the completion of this project included a chiller plant, boiler plant, 2 rooftop units, 240 Variable Air Volume (VAV) controllers, 12 Fan Terminal Units (FTUs) as well as 4 Fan Coil Units (FCUs).

one-city-place-building

 

Jarrell Background

Highlights

$156,123
Energy Savings

$260,776
Incentives

payout witht incentives icon

Simple Payback
2.03 Years

HVAC System

Energy Efficiency Strategy

As a primary goal of this installation, the Jarrell GEMs team worked through developing a strategy that would help to maximize City Place One's energy use. The strategies employed to achieve this included:

  • Evaluating the time of day scheduling with optimal start/stop.
  • Resetting the Air-Handling Unit (AHU) discharge air temperature.
  • Resetting the AHU duct static pressure.
  • CO2-based demand control outside air ventilation.
  • Occupied/unoccupied temperature setback.

 