Quality Work
Quality Work
Education
Ameren Training Center
$1.6 million HVAC and plumbing project.
De Mattias Hall at St. Louis University
14 tankless water heaters were installed using labor from four different trades (plumbers, tinners, electricians and pipefitters) to complete an efficient system in a minimal amount of space.
Kirk of the Hills
Replacement of a 40-year-old multi-zone system, utilizing multiple air handlers and condensing units connected to the existing ductwork. The new systems were connected to a building EMS system, giving the customer total control to minimize energy consumption.
Ladue Middle School
32,000 square foot classroom addition with new direct expansion rooftop air conditioning equipment with natural gas heat. The project included a major HVAC renovation to the existing buildings.
Linn State Technical College
A geothermal heat pump system to serve a new automotive addition to the existing campus. Approximately 156 geothermal wells at 200 feet deep serve this addition.
McKinley School
Jarrell served as the prime contractor for this $6,300,000 Design-Build HVAC rehab.